I 90 EB over Int Gold Creek
Fair Condition67 years old5,992 vehicles/day
Location
| State | Montana |
| County | Powell |
| Location | Gold Creek |
| Carries | I 90 EB |
| Crosses | Int Gold Creek |
| Coordinates | 46.59196, -112.92826 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 154.9 ft (47.2 m) |
| Max Span | 61.0 ft (18.6 m) |
| Deck Width | 40.0 ft (12.2 m) |
| Deck Area | 575.8 sq m |
| Main Spans | 3 |
| Year Built | 1959 (reconstructed 2004) |
Traffic
| Avg Daily Traffic | 5,992 (2023) |
| Truck Traffic | 18% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 624 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | I00090166+02721 |