Spain Bridge RD over E Gallatin River 058
Fair Condition51 years old100 vehicles/day
Location
| State | Montana |
| County | Gallatin |
| Location | 5m E Belgrade |
| Carries | Spain Bridge RD |
| Crosses | E Gallatin River 058 |
| Coordinates | 45.78155, -111.11322 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 5 (Fair) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Tee Beam |
| Total Length | 42.0 ft (12.8 m) |
| Max Span | 39.0 ft (11.9 m) |
| Deck Width | 24.3 ft (7.4 m) |
| Deck Area | 94.7 sq m |
| Main Spans | 1 |
| Year Built | 1975 |
Traffic
| Avg Daily Traffic | 100 (2025) |
| Truck Traffic | 3% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 125 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | L16053007+07001 |