Neibauer RD over Big Ditch 038

Fair Condition66 years old138 vehicles/day

Location

StateMontana
CountyYellowstone
Location4m NE Laurel
CarriesNeibauer RD
CrossesBig Ditch 038
Coordinates45.72628, -108.71349

Condition Ratings

Overall ConditionFair
Deck6 (Satisfactory)
Superstructure6 (Satisfactory)
Substructure6 (Satisfactory)
Channel/Waterway6 (Satisfactory)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialSteel
DesignStringer/Multi-beam
Total Length27.9 ft (8.5 m)
Max Span26.6 ft (8.1 m)
Deck Width28.9 ft (8.8 m)
Deck Area74.8 sq m
Main Spans1
Year Built1960

Traffic

Avg Daily Traffic138 (2023)
Truck Traffic3%
Lanes On Bridge2

Inspection & Ownership

Last InspectionDecember 2024
Inspection FrequencyEvery 24 months
OwnerCounty Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure NumberL56505004+01001

Nearby Bridges