S Pearson Avenue over Cains Coulee 095
Fair Condition61 years old100 vehicles/day
Location
| State | Montana |
| County | Dawson |
| Location | Glendive-s Pearson AVE |
| Carries | S Pearson Avenue |
| Crosses | Cains Coulee 095 |
| Coordinates | 47.09606, -104.71752 |
Condition Ratings
| Overall Condition | Fair |
| Channel/Waterway | 6 (Satisfactory) |
| Culvert | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Steel |
| Design | Culvert |
| Total Length | 29.5 ft (9 m) |
| Max Span | 29.5 ft (9 m) |
| Deck Area | 113.4 sq m |
| Main Spans | 1 |
| Year Built | 1965 |
Traffic
| Avg Daily Traffic | 100 (2025) |
| Truck Traffic | 3% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | December 2024 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | M11050000+00501 |