S 325-elloam RD over Fort Belknap Canal
Good Condition14 years old214 vehicles/day
Location
| State | Montana |
| County | Blaine |
| Location | 1m NE Chinook |
| Carries | S 325-elloam RD |
| Crosses | Fort Belknap Canal |
| Coordinates | 48.60106, -109.19718 |
Condition Ratings
| Overall Condition | Good |
| Channel/Waterway | 8 (Very Good) |
| Culvert | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Steel |
| Design | Culvert |
| Total Length | 37.1 ft (11.3 m) |
| Max Span | 37.1 ft (11.3 m) |
| Deck Area | 91.5 sq m |
| Main Spans | 1 |
| Year Built | 2012 |
Traffic
| Avg Daily Traffic | 214 (2023) |
| Truck Traffic | 8% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 125 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | S00325000+08001 |