County Highway over Bow Creek

Fair Condition43 years old15 vehicles/day

Location

StateNebraska
CountyCedar
Location2s 1w Of Hartington
CarriesCounty Highway
CrossesBow Creek
Coordinates42.58170, -97.29000

Condition Ratings

Overall ConditionFair
Deck7 (Good)
Superstructure6 (Satisfactory)
Substructure6 (Satisfactory)
Channel/Waterway6 (Satisfactory)
Scour Critical5 — Stable for scour

Physical Characteristics

MaterialSteel
DesignStringer/Multi-beam
Total Length69.9 ft (21.3 m)
Max Span67.9 ft (20.7 m)
Deck Width25.3 ft (7.7 m)
Deck Area164.0 sq m
Main Spans1
Year Built1983

Traffic

Avg Daily Traffic15 (2003)
Truck Traffic2%
Lanes On Bridge2

Inspection & Ownership

Last Inspection721
Inspection FrequencyEvery 48 months
OwnerCounty Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure NumberC001422115

Nearby Bridges