Fairview Road over Us-75
Good Condition36 years old1,000 vehicles/day
Location
| State | Nebraska |
| County | Sarpy |
| Location | Jct Us75/n370 2.5s .2w |
| Carries | Fairview Road |
| Crosses | Us-75 |
| Coordinates | 41.10390, -95.93110 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 250.0 ft (76.2 m) |
| Max Span | 136.2 ft (41.5 m) |
| Deck Width | 46.6 ft (14.2 m) |
| Deck Area | 1082.0 sq m |
| Main Spans | 2 |
| Year Built | 1990 |
Traffic
| Avg Daily Traffic | 1,000 (2003) |
| Truck Traffic | 10% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 4 |
Inspection & Ownership
| Last Inspection | 124 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | S075 07939 |