24th ST Rmp To I80 over Wb-i80 To Sb-us75 Rmp 4
Fair Condition36 years old91,540 vehicles/day
Location
| State | Nebraska |
| County | Douglas |
| Location | Grover ST Intrchg #16 |
| Carries | 24th ST Rmp To I80 |
| Crosses | Wb-i80 To Sb-us75 Rmp 4 |
| Coordinates | 41.22620, -95.95080 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 8 (Very Good) |
| Substructure | 8 (Very Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 377.0 ft (114.9 m) |
| Max Span | 181.1 ft (55.2 m) |
| Deck Width | 34.4 ft (10.5 m) |
| Deck Area | 1206.5 sq m |
| Main Spans | 3 |
| Year Built | 1990 |
Traffic
| Avg Daily Traffic | 91,540 (2018) |
| Truck Traffic | 12% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 324 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | S080 45316 |