Sr582 Boulder HWY over Flamingo Wash
Fair Condition25 years old17,500 vehicles/day
Location
| State | Nevada |
| County | Clark |
| Location | NW Of Henderson |
| Carries | Sr582 Boulder HWY |
| Crosses | Flamingo Wash |
| Coordinates | 36.14133, -115.09635 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 8 (Very Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Box Beam - Multiple |
| Total Length | 78.1 ft (23.8 m) |
| Max Span | 38.7 ft (11.8 m) |
| Deck Width | 71.9 ft (21.9 m) |
| Deck Area | 521.2 sq m |
| Main Spans | 2 |
| Year Built | 2001 |
Traffic
| Avg Daily Traffic | 17,500 (2017) |
| Truck Traffic | 3% |
| Lanes On Bridge | 5 |
Inspection & Ownership
| Last Inspection | October 2023 |
| Inspection Frequency | Every 48 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | B 194N |