Second ST over Truckee River

Fair Condition52 years old3,900 vehicles/day

Location

StateNevada
CountyWashoe
LocationReno
CarriesSecond ST
CrossesTruckee River
Coordinates39.52777, -119.80742

Condition Ratings

Overall ConditionFair
Deck7 (Good)
Superstructure7 (Good)
Substructure6 (Satisfactory)
Channel/Waterway7 (Good)
Scour Critical5 — Stable for scour

Physical Characteristics

MaterialSteel
DesignStringer/Multi-beam
Total Length159.1 ft (48.5 m)
Max Span155.8 ft (47.5 m)
Deck Width50.2 ft (15.3 m)
Deck Area742.0 sq m
Main Spans1
Year Built1974

Traffic

Avg Daily Traffic3,900 (2017)
Truck Traffic7%
Lanes On Bridge2

Inspection & Ownership

Last Inspection424
Inspection FrequencyEvery 24 months
OwnerCity/Municipal Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure NumberB1326E

Nearby Bridges