Arroyo Grande over Channel
Good Condition27 years old5,900 vehicles/day
Location
| State | Nevada |
| County | Clark |
| Location | Henderson |
| Carries | Arroyo Grande |
| Crosses | Channel |
| Coordinates | 36.02772, -115.05614 |
Condition Ratings
| Overall Condition | Good |
| Channel/Waterway | 8 (Very Good) |
| Culvert | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 24.6 ft (7.5 m) |
| Max Span | 11.8 ft (3.6 m) |
| Deck Area | 159 sq m |
| Main Spans | 2 |
| Year Built | 1999 |
Traffic
| Avg Daily Traffic | 5,900 (2017) |
| Lanes On Bridge | 4 |
Inspection & Ownership
| Last Inspection | October 2021 |
| Inspection Frequency | Every 48 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | B2122 |