Camino Al Norte ST over Gowan Retention Basin
Fair Condition35 years old18,900 vehicles/day
Location
| State | Nevada |
| County | Clark |
| Location | North West Las Vega |
| Carries | Camino Al Norte ST |
| Crosses | Gowan Retention Basin |
| Coordinates | 36.25209, -115.15311 |
Condition Ratings
| Overall Condition | Fair |
| Channel/Waterway | 8 (Very Good) |
| Culvert | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 64.3 ft (19.6 m) |
| Max Span | 31.2 ft (9.5 m) |
| Deck Area | 227.4 sq m |
| Main Spans | 2 |
| Year Built | 1991 |
Traffic
| Avg Daily Traffic | 18,900 (2017) |
| Truck Traffic | 10% |
| Lanes On Bridge | 5 |
Inspection & Ownership
| Last Inspection | November 2021 |
| Inspection Frequency | Every 48 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | B2197 |