Sr445 Pyramid HWY over Channel
Good Condition20 years old27,000 vehicles/day
Location
| State | Nevada |
| County | Washoe |
| Location | Spanish Springs |
| Carries | Sr445 Pyramid HWY |
| Crosses | Channel |
| Coordinates | 39.63739, -119.71264 |
Condition Ratings
| Overall Condition | Good |
| Channel/Waterway | 7 (Good) |
| Culvert | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 46.9 ft (14.3 m) |
| Max Span | 14.1 ft (4.3 m) |
| Deck Area | 540.5 sq m |
| Main Spans | 3 |
| Year Built | 2006 |
Traffic
| Avg Daily Traffic | 27,000 (2017) |
| Truck Traffic | 1% |
| Lanes On Bridge | 8 |
Inspection & Ownership
| Last Inspection | 623 |
| Inspection Frequency | Every 48 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | B3088 |