Exit To Swenson ST over Exit To Paradise RD
Fair Condition41 years old15,000 vehicles/day
Location
| State | Nevada |
| County | Clark |
| Location | Mccarran Airport L V |
| Carries | Exit To Swenson ST |
| Crosses | Exit To Paradise RD |
| Coordinates | 36.08502, -115.14557 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Box Beam - Multiple |
| Total Length | 194.9 ft (59.4 m) |
| Max Span | 80.1 ft (24.4 m) |
| Deck Width | 78.4 ft (23.9 m) |
| Deck Area | 1419.7 sq m |
| Main Spans | 3 |
| Year Built | 1985 |
Traffic
| Avg Daily Traffic | 15,000 (2017) |
| Truck Traffic | 1% |
| Lanes On Bridge | 4 |
| Lanes Under Bridge | 5 |
Inspection & Ownership
| Last Inspection | 223 |
| Inspection Frequency | Every 24 months |
| Owner | Other Local Agencies |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | H1818 |