I 15 Ramp To Sp. M over Ramp Flamingo To I 15
Fair Condition27 years old17,000 vehicles/day
Location
| State | Nevada |
| County | Clark |
| Location | Las Vegas |
| Carries | I 15 Ramp To Sp. M |
| Crosses | Ramp Flamingo To I 15 |
| Coordinates | 36.11702, -115.18021 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Box Beam - Multiple |
| Total Length | 506.9 ft (154.5 m) |
| Max Span | 194.9 ft (59.4 m) |
| Deck Width | 43.0 ft (13.1 m) |
| Deck Area | 2024.0 sq m |
| Main Spans | 3 |
| Year Built | 1999 |
Traffic
| Avg Daily Traffic | 17,000 (2021) |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 221 |
| Inspection Frequency | Every 48 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | H2015 |