Eastern AVE over Anthem PKWY
Fair Condition27 years old1,250 vehicles/day
Location
| State | Nevada |
| County | Clark |
| Location | Henderson |
| Carries | Eastern AVE |
| Crosses | Anthem PKWY |
| Coordinates | 35.98336, -115.10056 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 8 (Very Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Box Beam - Multiple |
| Total Length | 107.0 ft (32.6 m) |
| Max Span | 100.1 ft (30.5 m) |
| Deck Width | 27.2 ft (8.3 m) |
| Deck Area | 270.6 sq m |
| Main Spans | 1 |
| Year Built | 1999 |
Traffic
| Avg Daily Traffic | 1,250 (2021) |
| Lanes On Bridge | 1 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 923 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | H2578 |