I 15 over Oakey BLVD
Good Condition8 years old120,500 vehicles/day
Location
| State | Nevada |
| County | Clark |
| Location | Project Neon |
| Carries | I 15 |
| Crosses | Oakey BLVD |
| Coordinates | 36.15162, -115.16475 |
Condition Ratings
| Overall Condition | Good |
| Deck | 8 (Very Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 8 (Very Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Box Beam - Multiple |
| Total Length | 221.1 ft (67.4 m) |
| Max Span | 127.6 ft (38.9 m) |
| Deck Width | 150.6 ft (45.9 m) |
| Deck Area | 3093.7 sq m |
| Main Spans | 2 |
| Year Built | 2018 |
Traffic
| Avg Daily Traffic | 120,500 (2021) |
| Truck Traffic | 5% |
| Lanes On Bridge | 7 |
| Lanes Under Bridge | 5 |
Inspection & Ownership
| Last Inspection | October 2024 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | H3217S |