I 80e over US 95a
Fair Condition63 years old4,800 vehicles/day
Location
| State | Nevada |
| County | Lyon |
| Location | Fernley |
| Carries | I 80e |
| Crosses | US 95a |
| Coordinates | 39.61314, -119.21810 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Box Beam - Single/Spread |
| Total Length | 133.9 ft (40.8 m) |
| Max Span | 51.8 ft (15.8 m) |
| Deck Width | 43.0 ft (13.1 m) |
| Deck Area | 534.5 sq m |
| Main Spans | 3 |
| Year Built | 1963 (reconstructed 1972) |
Traffic
| Avg Daily Traffic | 4,800 (2021) |
| Truck Traffic | 39% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 521 |
| Inspection Frequency | Every 48 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | I 740E |