I 80e over Downtown Interchange
Good Condition49 years old4,100 vehicles/day
Location
| State | Nevada |
| County | Humboldt |
| Location | Winnemucca |
| Carries | I 80e |
| Crosses | Downtown Interchange |
| Coordinates | 40.98049, -117.72812 |
Condition Ratings
| Overall Condition | Good |
| Deck | 8 (Very Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Box Beam - Single/Spread |
| Total Length | 313.0 ft (95.4 m) |
| Max Span | 167.0 ft (50.9 m) |
| Deck Width | 45.6 ft (13.9 m) |
| Deck Area | 1326.1 sq m |
| Main Spans | 2 |
| Year Built | 1977 |
Traffic
| Avg Daily Traffic | 4,100 (2021) |
| Truck Traffic | 38% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 4 |
Inspection & Ownership
| Last Inspection | 723 |
| Inspection Frequency | Every 48 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | I 871E |