I 80 over Sr445 Pyramid Way
Good Condition27 years old92,000 vehicles/day
Location
| State | Nevada |
| County | Washoe |
| Location | Sparks |
| Carries | I 80 |
| Crosses | Sr445 Pyramid Way |
| Coordinates | 39.53396, -119.75291 |
Condition Ratings
| Overall Condition | Good |
| Deck | 8 (Very Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel |
| Design | Box Beam - Multiple |
| Total Length | 212.9 ft (64.9 m) |
| Max Span | 210.0 ft (64 m) |
| Deck Width | 120.7 ft (36.8 m) |
| Deck Area | 2388.3 sq m |
| Main Spans | 1 |
| Year Built | 1999 |
Traffic
| Avg Daily Traffic | 92,000 (2021) |
| Truck Traffic | 25% |
| Lanes On Bridge | 4 |
| Lanes Under Bridge | 4 |
Inspection & Ownership
| Last Inspection | 524 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | I1006 |