Salmon Street WB over Merrimack River Csx RD
Fair Condition56 years old17,799 vehicles/day
Location
| State | New Hampshire |
| County | Hillsborough |
| Location | .3mi W Jct US 3 |
| Carries | Salmon Street WB |
| Crosses | Merrimack River Csx RD |
| Coordinates | 43.00377, -71.46959 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 5 (Fair) |
| Substructure | 5 (Fair) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Steel Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 857.9 ft (261.5 m) |
| Max Span | 165.0 ft (50.3 m) |
| Deck Width | 37.1 ft (11.3 m) |
| Deck Area | 2954.9 sq m |
| Main Spans | 4 |
| Year Built | 1970 (reconstructed 1999) |
Traffic
| Avg Daily Traffic | 17,799 (2023) |
| Truck Traffic | 5% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 724 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is possibly eligible (requires evaluation) |
| Structure Number | 016101060007200 |