I-89 SB over Nh114
Fair Condition59 years old9,388 vehicles/day
Location
| State | New Hampshire |
| County | Merrimack |
| Location | 2.0mi New London T.l. |
| Carries | I-89 SB |
| Crosses | Nh114 |
| Coordinates | 43.37496, -71.94411 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 5 (Fair) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 121.1 ft (36.9 m) |
| Max Span | 49.9 ft (15.2 m) |
| Deck Width | 43.6 ft (13.3 m) |
| Deck Area | 490.8 sq m |
| Main Spans | 3 |
| Year Built | 1967 (reconstructed 1987) |
Traffic
| Avg Daily Traffic | 9,388 (2023) |
| Truck Traffic | 9% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 423 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 025001090014400 |