I-25 NB over Simon Canyon
Fair Condition89 years old6,496 vehicles/day
Location
| State | New Mexico |
| County | Socorro |
| Location | 0.5 Mi S Jct Nm-107/i-25 |
| Carries | I-25 NB |
| Crosses | Simon Canyon |
| Coordinates | 33.63147, -107.12676 |
Condition Ratings
| Overall Condition | Fair |
| Channel/Waterway | 5 (Fair) |
| Culvert | 5 (Fair) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 29.9 ft (9.1 m) |
| Max Span | 7.9 ft (2.4 m) |
| Deck Area | 288.5 sq m |
| Main Spans | 4 |
| Year Built | 1937 (reconstructed 1968) |
Traffic
| Avg Daily Traffic | 6,496 (2023) |
| Truck Traffic | 45% |
| Lanes On Bridge | 4 |
Inspection & Ownership
| Last Inspection | 223 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000000003182 |