Irr/nm-602 over Rio Pescado

Fair Condition58 years old1,146 vehicles/day

Location

StateNew Mexico
CountyMcKinley
Location30.6 Mi S Of I-40
CarriesIrr/nm-602
CrossesRio Pescado
Coordinates35.11554, -108.69713

Condition Ratings

Overall ConditionFair
Deck6 (Satisfactory)
Superstructure6 (Satisfactory)
Substructure7 (Good)
Channel/Waterway7 (Good)
Scour CriticalUnknown

Physical Characteristics

MaterialWood or Timber
DesignStringer/Multi-beam
Total Length82.0 ft (25 m)
Max Span30.5 ft (9.3 m)
Deck Width32.2 ft (9.8 m)
Deck Area245 sq m
Main Spans3
Year Built1968

Traffic

Avg Daily Traffic1,146 (2023)
Truck Traffic17%
Lanes On Bridge2

Inspection & Ownership

Last Inspection723
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is possibly eligible (requires evaluation)
Structure Number000000000003372

Nearby Bridges