I-25 Nbl/sbl/frtg over North Pino Arroyo

Fair Condition71 years old144,871 vehicles/day

Location

StateNew Mexico
CountyBernalillo
Location0.50 Mi S Paseo Del Norte
CarriesI-25 Nbl/sbl/frtg
CrossesNorth Pino Arroyo
Coordinates35.16529, -106.58576

Condition Ratings

Overall ConditionFair
Channel/Waterway7 (Good)
Culvert5 (Fair)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete
DesignCulvert
Total Length44.0 ft (13.4 m)
Max Span9.8 ft (3 m)
Deck Area506.5 sq m
Main Spans4
Year Built1955 (reconstructed 1985)

Traffic

Avg Daily Traffic144,871 (2023)
Truck Traffic5%
Lanes On Bridge14

Inspection & Ownership

Last InspectionOctober 2023
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number000000000005752

Nearby Bridges