I-25 Nbl over Madera Canyon

Fair Condition61 years old8,854 vehicles/day

Location

StateNew Mexico
CountySocorro
Location3.9 Mi N Of Jct Us-380
CarriesI-25 Nbl
CrossesMadera Canyon
Coordinates33.97345, -106.88985

Condition Ratings

Overall ConditionFair
Channel/Waterway6 (Satisfactory)
Culvert6 (Satisfactory)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete
DesignCulvert
Total Length151.9 ft (46.3 m)
Max Span9.8 ft (3 m)
Deck Area578.8 sq m
Main Spans10
Year Built1965

Traffic

Avg Daily Traffic8,854 (2023)
Truck Traffic45%
Lanes On Bridge2

Inspection & Ownership

Last InspectionOctober 2024
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number000000000006606

Nearby Bridges