I-40 Ebl over Trujillo Creek
Fair Condition53 years old14,146 vehicles/day
Location
| State | New Mexico |
| County | Quay |
| Location | 40.6 M E Jct I-40/NM-209 |
| Carries | I-40 Ebl |
| Crosses | Trujillo Creek |
| Coordinates | 35.18298, -103.05734 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 235.2 ft (71.7 m) |
| Max Span | 81.0 ft (24.7 m) |
| Deck Width | 44.9 ft (13.7 m) |
| Deck Area | 982.3 sq m |
| Main Spans | 3 |
| Year Built | 1973 |
Traffic
| Avg Daily Traffic | 14,146 (2023) |
| Truck Traffic | 45% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 424 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000000006669 |