I-40 Wbl over Horizon Ave/milan
Good Condition55 years old18,572 vehicles/day
Location
| State | New Mexico |
| County | Cibola |
| Location | I-40 Exit 79 |
| Carries | I-40 Wbl |
| Crosses | Horizon Ave/milan |
| Coordinates | 35.18239, -107.90105 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 185.0 ft (56.4 m) |
| Max Span | 102.0 ft (31.1 m) |
| Deck Width | 44.9 ft (13.7 m) |
| Deck Area | 772.7 sq m |
| Main Spans | 3 |
| Year Built | 1971 (reconstructed 1999) |
Traffic
| Avg Daily Traffic | 18,572 (2023) |
| Truck Traffic | 14% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 4 |
Inspection & Ownership
| Last Inspection | 323 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000000007315 |