I-25 Sbl over Arroyo Hondo Channel
Fair Condition51 years old24,998 vehicles/day
Location
| State | New Mexico |
| County | Santa Fe |
| Location | 2.66 M N Of ST Francis DR |
| Carries | I-25 Sbl |
| Crosses | Arroyo Hondo Channel |
| Coordinates | 35.62153, -105.91954 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 5 (Fair) |
| Substructure | 5 (Fair) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 222.1 ft (67.7 m) |
| Max Span | 91.9 ft (28 m) |
| Deck Width | 44.9 ft (13.7 m) |
| Deck Area | 927.5 sq m |
| Main Spans | 3 |
| Year Built | 1975 |
Traffic
| Avg Daily Traffic | 24,998 (2023) |
| Truck Traffic | 45% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 424 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000000007369 |