I-40 Ebl/wbl over Gutierrez Canyon

Fair Condition50 years old41,443 vehicles/day

Location

StateNew Mexico
CountyBernalillo
Location17.2 Mi E Of Jct I-25
CarriesI-40 Ebl/wbl
CrossesGutierrez Canyon
Coordinates35.10176, -106.35084

Condition Ratings

Overall ConditionFair
Channel/Waterway7 (Good)
Culvert6 (Satisfactory)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete
DesignCulvert
Total Length25.9 ft (7.9 m)
Max Span9.8 ft (3 m)
Deck Area250.4 sq m
Main Spans2
Year Built1976

Traffic

Avg Daily Traffic41,443 (2023)
Truck Traffic45%
Lanes On Bridge6

Inspection & Ownership

Last Inspection124
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number000000000007578

Nearby Bridges