I-40 EB over Loop-36
Fair Condition45 years old14,244 vehicles/day
Location
| State | New Mexico |
| County | Quay |
| Location | Tucumcari/ E. Interchange |
| Carries | I-40 EB |
| Crosses | Loop-36 |
| Coordinates | 35.17058, -103.67463 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 5 (Fair) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Frame |
| Total Length | 188.0 ft (57.3 m) |
| Max Span | 104.0 ft (31.7 m) |
| Deck Width | 53.1 ft (16.2 m) |
| Deck Area | 928.3 sq m |
| Main Spans | 3 |
| Year Built | 1981 |
Traffic
| Avg Daily Traffic | 14,244 (2023) |
| Truck Traffic | 45% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 4 |
Inspection & Ownership
| Last Inspection | 923 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000000007930 |