Io-4155 over I-40 And I-40 EB Off Rmp

Good Condition19 years old20,245 vehicles/day

Location

StateNew Mexico
CountyBernalillo
LocationCoors Interchange
CarriesIo-4155
CrossesI-40 And I-40 EB Off Rmp
Coordinates35.10612, -106.70531

Condition Ratings

Overall ConditionGood
Deck7 (Good)
Superstructure7 (Good)
Substructure7 (Good)
Scour CriticalNot applicable

Physical Characteristics

MaterialPrestressed Concrete Continuous
DesignStringer/Multi-beam
Total Length244.1 ft (74.4 m)
Max Span84.0 ft (25.6 m)
Deck Width44.0 ft (13.4 m)
Deck Area997.0 sq m
Main Spans3
Year Built2007

Traffic

Avg Daily Traffic20,245 (2023)
Truck Traffic14%
Lanes On Bridge2
Lanes Under Bridge7

Inspection & Ownership

Last Inspection923
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number000000000009374

Nearby Bridges