I-25 Nbl over Rio Puerco
Good Condition14 years old9,922 vehicles/day
Location
| State | New Mexico |
| County | Socorro |
| Location | 1.1 M. S Of Bernardo Exit |
| Carries | I-25 Nbl |
| Crosses | Rio Puerco |
| Coordinates | 34.40618, -106.84784 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 515.1 ft (157 m) |
| Max Span | 73.2 ft (22.3 m) |
| Deck Width | 44.9 ft (13.7 m) |
| Deck Area | 2150.9 sq m |
| Main Spans | 7 |
| Year Built | 2012 |
Traffic
| Avg Daily Traffic | 9,922 (2023) |
| Truck Traffic | 45% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 223 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000000009549 |