Nm-566 over Rio Puerco (north Fork)
Good Condition2 years old3,241 vehicles/day
Location
| State | New Mexico |
| County | McKinley |
| Location | 6.5 Mi N Of Nm-118 |
| Carries | Nm-566 |
| Crosses | Rio Puerco (north Fork) |
| Coordinates | 35.61162, -108.56036 |
Condition Ratings
| Overall Condition | Good |
| Deck | 8 (Very Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 8 (Very Good) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 237.9 ft (72.5 m) |
| Max Span | 79.1 ft (24.1 m) |
| Deck Width | 46.9 ft (14.3 m) |
| Deck Area | 1036.8 sq m |
| Main Spans | 3 |
| Year Built | 2024 |
Traffic
| Avg Daily Traffic | 3,241 (2022) |
| Truck Traffic | 5% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | October 2024 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000000009983 |