IRR BIA RTE 30 over San Jose River

Good Condition16 years old1,675 vehicles/day

Location

StateNew Mexico
CountyCibola
LocationW Edge Of Mccartys
CarriesIRR BIA RTE 30
CrossesSan Jose River
Coordinates35.06520, -107.68083

Condition Ratings

Overall ConditionGood
Deck8 (Very Good)
Superstructure8 (Very Good)
Substructure8 (Very Good)
Channel/Waterway8 (Very Good)
Scour Critical5 — Stable for scour

Physical Characteristics

MaterialConcrete Continuous
DesignSlab
Total Length100.1 ft (30.5 m)
Max Span37.4 ft (11.4 m)
Deck Width54.1 ft (16.5 m)
Deck Area503.2 sq m
Main Spans3
Year Built2010

Traffic

Avg Daily Traffic1,675 (2023)
Truck Traffic5%
Lanes On Bridge2

Inspection & Ownership

Last Inspection423
Inspection FrequencyEvery 24 months
OwnerBureau of Indian Affairs
Historical SignificanceBridge is not eligible for the National Register
Structure Number00000000000M160

Nearby Bridges