IRR BIA RTE 709 over Lucero Creek
Fair Condition48 years old50 vehicles/day
Location
| State | New Mexico |
| County | Taos |
| Location | 3.4 Km NW Of Taos Pueblo |
| Carries | IRR BIA RTE 709 |
| Crosses | Lucero Creek |
| Coordinates | 36.47250, -105.56108 |
Condition Ratings
| Overall Condition | Fair |
| Channel/Waterway | 6 (Satisfactory) |
| Culvert | 6 (Satisfactory) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Culvert |
| Total Length | 25.9 ft (7.9 m) |
| Max Span | 12.1 ft (3.7 m) |
| Deck Width | 31.5 ft (9.6 m) |
| Deck Area | 75.8 sq m |
| Main Spans | 2 |
| Year Built | 1978 |
Traffic
| Avg Daily Traffic | 50 (2023) |
| Truck Traffic | 5% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 323 |
| Inspection Frequency | Every 24 months |
| Owner | Bureau of Indian Affairs |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 00000000000M204 |