RTE 11 over Potato Creek
Fair Condition52 years old1,314 vehicles/day
Location
| State | New York |
| County | Broome |
| Location | .4 Mi S Exit 7 I81 On US |
| Carries | RTE 11 |
| Crosses | Potato Creek |
| Coordinates | 42.22828, -75.91853 |
Condition Ratings
| Overall Condition | Fair |
| Channel/Waterway | 5 (Fair) |
| Culvert | 5 (Fair) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete Continuous |
| Design | Culvert |
| Total Length | 27.9 ft (8.5 m) |
| Max Span | 12.8 ft (3.9 m) |
| Deck Width | 41.0 ft (12.5 m) |
| Deck Area | 106.2 sq m |
| Main Spans | 2 |
| Year Built | 1974 |
Traffic
| Avg Daily Traffic | 1,314 (2021) |
| Truck Traffic | 7% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 923 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 000000001008270 |