RTE I278 over Ramp To Hamilton
Good Condition29 years old181,470 vehicles/day
Location
| State | New York |
| County | Kings |
| Location | Jct Prospect Expy & I278 |
| Carries | RTE I278 |
| Crosses | Ramp To Hamilton |
| Coordinates | 40.66783, -73.99586 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 236.9 ft (72.2 m) |
| Max Span | 96.8 ft (29.5 m) |
| Deck Width | 37.1 ft (11.3 m) |
| Deck Area | 815.9 sq m |
| Main Spans | 3 |
| Year Built | 1997 |
Traffic
| Avg Daily Traffic | 181,470 (2017) |
| Truck Traffic | 9% |
| Lanes On Bridge | 1 |
| Lanes Under Bridge | 1 |
Inspection & Ownership
| Last Inspection | 624 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 00000000106531K |