RTE I95 over I-278 EB Ramp Bruckner
Fair Condition56 years old
Location
| State | New York |
| County | Bronx |
| Location | Jct I95 & I278 & I295 |
| Carries | RTE I95 |
| Crosses | I-278 EB Ramp Bruckner |
| Coordinates | 40.82797, -73.84562 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 1103.0 ft (336.2 m) |
| Max Span | 127.0 ft (38.7 m) |
| Deck Width | 27.9 ft (8.5 m) |
| Deck Area | 2857.7 sq m |
| Main Spans | 11 |
| Year Built | 1970 (reconstructed 2002) |
Traffic
| Truck Traffic | 13% |
| Lanes On Bridge | 1 |
| Lanes Under Bridge | 14 |
Inspection & Ownership
| Last Inspection | 624 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 00000000106650A |