RTE I95 over I678 Bruckner BLVD Bru

Fair Condition55 years old79,759 vehicles/day

Location

StateNew York
CountyBronx
LocationJct I95&i878&i78
CarriesRTE I95
CrossesI678 Bruckner BLVD Bru
Coordinates40.82909, -73.83705

Condition Ratings

Overall ConditionFair
Deck7 (Good)
Superstructure6 (Satisfactory)
Substructure6 (Satisfactory)
Channel/Waterway7 (Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialSteel
DesignStringer/Multi-beam
Total Length2742.1 ft (835.8 m)
Max Span172.9 ft (52.7 m)
Deck Width73.8 ft (22.5 m)
Deck Area18805.5 sq m
Main Spans21
Year Built1971 (reconstructed 2002)

Traffic

Avg Daily Traffic79,759 (2020)
Truck Traffic8%
Lanes On Bridge3
Lanes Under Bridge30

Inspection & Ownership

Last InspectionOctober 2024
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number000000001066539

Nearby Bridges