RTE I278 over Bruckner BLVD SB Relief
Fair Condition67 years old24,321 vehicles/day
Location
| State | New York |
| County | Bronx |
| Location | 1 Mi NE Jct I278 & I87 |
| Carries | RTE I278 |
| Crosses | Bruckner BLVD SB Relief |
| Coordinates | 40.80363, -73.91438 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 8 (Very Good) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 903.9 ft (275.5 m) |
| Max Span | 66.9 ft (20.4 m) |
| Deck Width | 40.4 ft (12.3 m) |
| Deck Area | 3388.7 sq m |
| Main Spans | 14 |
| Year Built | 1959 (reconstructed 2019) |
Traffic
| Avg Daily Traffic | 24,321 (2003) |
| Truck Traffic | 9% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 924 |
| Inspection Frequency | Every 24 months |
| Owner | Local Toll Authority |
| Historical Significance | Historical significance is not determined |
| Structure Number | 00000000106666B |