RTE I81 over Tiba Shop Access Road C
Fair Condition88 years old3,786 vehicles/day
Location
| State | New York |
| County | Jefferson |
| Location | 2.5 Mi.sw Of Alex. Bay |
| Carries | RTE I81 |
| Crosses | Tiba Shop Access Road C |
| Coordinates | 44.30149, -75.98182 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 5 (Fair) |
| Substructure | 7 (Good) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Steel |
| Design | Suspension |
| Total Length | 4500.0 ft (1371.6 m) |
| Max Span | 799.9 ft (243.8 m) |
| Deck Width | 30.5 ft (9.3 m) |
| Deck Area | 12755.9 sq m |
| Main Spans | 3 |
| Year Built | 1938 (reconstructed 2000) |
Traffic
| Avg Daily Traffic | 3,786 (2019) |
| Truck Traffic | 31% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 8 |
Inspection & Ownership
| Last Inspection | 823 |
| Inspection Frequency | Every 24 months |
| Owner | Local Toll Authority |
| Historical Significance | Historical significance is not determined |
| Structure Number | 000000005523240 |