County Highway over I-29/GREAT Bend Int

Fair Condition52 years old315 vehicles/day

Location

StateNorth Dakota
CountyRichland
Location8 South Of Nd 13
CarriesCounty Highway
CrossesI-29/GREAT Bend Int
Coordinates46.15302, -96.83431

Condition Ratings

Overall ConditionFair
Deck7 (Good)
Superstructure7 (Good)
Substructure5 (Fair)
Scour CriticalNot applicable

Physical Characteristics

MaterialSteel Continuous
DesignStringer/Multi-beam
Total Length234.9 ft (71.6 m)
Max Span117.1 ft (35.7 m)
Deck Width32.5 ft (9.9 m)
Deck Area708.8 sq m
Main Spans2
Year Built1974 (reconstructed 2021)

Traffic

Avg Daily Traffic315 (2019)
Truck Traffic12%
Lanes On Bridge2
Lanes Under Bridge4

Inspection & Ownership

Last Inspection524
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number0029015079

Nearby Bridges