Interstate 94 over Cleveland Interchange

Fair Condition68 years old3,450 vehicles/day

Location

StateNorth Dakota
CountyStutsman
Location10 East Of Nd 30
CarriesInterstate 94
CrossesCleveland Interchange
Coordinates46.88599, -99.12198

Condition Ratings

Overall ConditionFair
Deck5 (Fair)
Superstructure5 (Fair)
Substructure5 (Fair)
Scour CriticalNot applicable

Physical Characteristics

MaterialConcrete Continuous
DesignTee Beam
Total Length115.2 ft (35.1 m)
Max Span43.0 ft (13.1 m)
Deck Width43.0 ft (13.1 m)
Deck Area459.8 sq m
Main Spans3
Year Built1958 (reconstructed 1985)

Traffic

Avg Daily Traffic3,450 (2020)
Truck Traffic22%
Lanes On Bridge2
Lanes Under Bridge2

Inspection & Ownership

Last InspectionNovember 2024
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number0094238793 L

Nearby Bridges