Union Centre BLVD over Ir-75
Good Condition29 years old2,000 vehicles/day
Location
| State | Ohio |
| County | Butler |
| Location | 1.7 Mi N. Of But Co Line |
| Carries | Union Centre BLVD |
| Crosses | Ir-75 |
| Coordinates | 39.32259, -84.42455 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 326.8 ft (99.6 m) |
| Max Span | 162.4 ft (49.5 m) |
| Deck Width | 93.8 ft (28.6 m) |
| Deck Area | 2848.6 sq m |
| Main Spans | 2 |
| Year Built | 1997 |
Traffic
| Avg Daily Traffic | 2,000 (1999) |
| Truck Traffic | 15% |
| Lanes On Bridge | 6 |
| Lanes Under Bridge | 6 |
Inspection & Ownership
| Last Inspection | 224 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 0901601 |