SR 122 over Overflow Great Miami
Fair Condition79 years old11,220 vehicles/day
Location
| State | Ohio |
| County | Butler |
| Location | 0verflow Great Miami Rive |
| Carries | SR 122 |
| Crosses | Overflow Great Miami |
| Coordinates | 39.51951, -84.41039 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 6 (Satisfactory) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Steel Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 311.0 ft (94.8 m) |
| Max Span | 85.0 ft (25.9 m) |
| Deck Width | 40.0 ft (12.2 m) |
| Deck Area | 1156.6 sq m |
| Main Spans | 4 |
| Year Built | 1947 (reconstructed 1993) |
Traffic
| Avg Daily Traffic | 11,220 (2015) |
| Truck Traffic | 4% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 724 |
| Inspection Frequency | Every 12 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 0902217 |