Ramp B Ir275 over Aicholtz Road (future)
Good Condition12 years old17,800 vehicles/day
Location
| State | Ohio |
| County | Clermont |
| Location | Ramp From 275 NB To 32 EB |
| Carries | Ramp B Ir275 |
| Crosses | Aicholtz Road (future) |
| Coordinates | 39.09866, -84.28498 |
Condition Ratings
| Overall Condition | Good |
| Deck | 8 (Very Good) |
| Superstructure | 9 (Excellent) |
| Substructure | 8 (Very Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 190.0 ft (57.9 m) |
| Max Span | 77.8 ft (23.7 m) |
| Deck Width | 44.9 ft (13.7 m) |
| Deck Area | 793.2 sq m |
| Main Spans | 3 |
| Year Built | 2014 |
Traffic
| Avg Daily Traffic | 17,800 (2010) |
| Truck Traffic | 3% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 3 |
Inspection & Ownership
| Last Inspection | 124 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 1305395 |