IRR Alpine Rd. 58 over Parker Creek

Fair Condition58 years old200 vehicles/day

Location

StateCalifornia
CountyModoc
Location0.3 Mi N Of Parker Cr.rd.
CarriesIRR Alpine Rd. 58
CrossesParker Creek
Coordinates41.50699, -120.43299

Condition Ratings

Overall ConditionFair
Deck7 (Good)
Superstructure6 (Satisfactory)
Substructure7 (Good)
Channel/Waterway4 (Poor)
Scour CriticalUnknown

Physical Characteristics

MaterialSteel
DesignStringer/Multi-beam
Total Length26.9 ft (8.2 m)
Max Span25.9 ft (7.9 m)
Deck Width22.0 ft (6.7 m)
Deck Area54.9 sq m
Main Spans1
Year Built1968 (reconstructed 1989)

Traffic

Avg Daily Traffic200 (2012)
Truck Traffic8%
Lanes On Bridge2

Inspection & Ownership

Last Inspection823
Inspection FrequencyEvery 24 months
OwnerCounty Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number03C0046

Nearby Bridges