Hoc-08 Cristmas Rk over Arney Run(christmas Rock
Good Condition37 years old849 vehicles/day
Location
| State | Ohio |
| County | Fairfield |
| Location | 0.3 Mi E Of Hamburg RD SW |
| Carries | Hoc-08 Cristmas Rk |
| Crosses | Arney Run(christmas Rock |
| Coordinates | 39.66849, -82.63373 |
Condition Ratings
| Overall Condition | Good |
| Deck | 9 (Excellent) |
| Superstructure | 9 (Excellent) |
| Substructure | 9 (Excellent) |
| Channel/Waterway | 9 (Excellent) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 29.9 ft (9.1 m) |
| Max Span | 28.5 ft (8.7 m) |
| Deck Width | 24.0 ft (7.3 m) |
| Deck Area | 66.4 sq m |
| Main Spans | 1 |
| Year Built | 1989 (reconstructed 2023) |
Traffic
| Avg Daily Traffic | 849 (2022) |
| Truck Traffic | 8% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | December 2024 |
| Inspection Frequency | Every 12 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 2336081 |