County Road 75 over Fitchu Ditch

Fair Condition108 years old129 vehicles/day

Location

StateOhio
CountyHardin
LocationAt Jct. Of Twp. 30
CarriesCounty Road 75
CrossesFitchu Ditch
Coordinates40.79098, -83.76654

Condition Ratings

Overall ConditionFair
Deck5 (Fair)
Superstructure5 (Fair)
Substructure6 (Satisfactory)
Channel/Waterway7 (Good)
Scour Critical5 — Stable for scour

Physical Characteristics

MaterialPrestressed Concrete
DesignBox Beam - Multiple
Total Length40.0 ft (12.2 m)
Max Span37.1 ft (11.3 m)
Deck Width24.0 ft (7.3 m)
Deck Area89.1 sq m
Main Spans1
Year Built1918 (reconstructed 1974)

Traffic

Avg Daily Traffic129 (2015)
Truck Traffic8%
Lanes On Bridge2

Inspection & Ownership

Last Inspection624
Inspection FrequencyEvery 12 months
OwnerCounty Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number3338118

Nearby Bridges